One specification, twenty-two inhibitor bands: compare storage window, transport fit and downstream use side by side.
The grades below share a single chemical identity and differ in the hydroquinone band, which is the variable that decides how long a lot can wait and how far it can travel. Reading the table from left to right, the working window lengthens as the band rises, and the recommended transport moves from short road deliveries towards ocean freight and multi-leg relays.
Figures for chemical and physical properties are typical values and are not a specification. The batch analysis issued with each lot governs what is delivered, and any selection decision should be confirmed against the actual delivery conditions at the receiving site rather than against the table alone.
Typical values, not for specification. Batch certificate governs delivery.
| Brand | Grade / Model | Product line | HQ band (ppm) | Storage and transit window | Recommended transport | Typical downstream | Packaging | Handling focus | Grade |
|---|---|---|---|---|---|---|---|---|---|
| Standard VAM | |||||||||
| Celanese VAM | Celanese VAM HQ 3-5 | Standard VAM | 3-5 | Days | ISO tank, road tanker | PVAc emulsion adhesives | Bulk or drum | Charge within days | Details |
| Celanese VAM | Celanese VAM HQ 4-6 | Standard VAM | 4-6 | Days to 2 weeks | Road tanker, direct line | Architectural binders | Bulk | Closed-loop unloading | Details |
| Celanese VAM | Celanese VAM HQ 4-7 | Standard VAM | 4-7 | 2-4 weeks | ISO tank or tanker | Mixed polymer campaigns | Bulk or drum | Changeover hygiene | Details |
| Celanese VAM | Celanese VAM HQ 5-7 | Standard VAM | 5-7 | 2-4 weeks | Road tanker, scheduled | Seasonal coatings and adhesives | Bulk | Summer temperature watch | Details |
| Celanese VAM | Celanese VAM HQ 6-8 | Standard VAM | 6-8 | 3-5 weeks | ISO tank, rail car | Sizing, surface sizing | Bulk or drum | Pre-charge re-test | Details |
| Celanese VAM | Celanese VAM HQ 7-9 | Standard VAM | 7-9 | 3-5 weeks | ISO tank | PVOH and PVB routes | Bulk or drum | Headspace consistency | Details |
| Celanese VAM | Celanese VAM HQ 8-10 | Standard VAM | 8-10 | 3-6 weeks | ISO tank, dried vent | Interlayer resins | Bulk or drum | Moisture protection | Details |
| Celanese VAM | Celanese VAM HQ 8-12 | Standard VAM | 8-12 | 4-8 weeks | Rail car, barge | Printing inks and varnishes | Bulk | Seal discipline | Details |
| Celanese VAM | Celanese VAM HQ 10-12 | Standard VAM | 10-12 | 5-8 weeks | ISO tank, drums | Export coatings and adhesives | Bulk or drum | Container choice | Details |
| Celanese VAM | Celanese VAM HQ 12-15 | Standard VAM | 12-15 | 6-10 weeks | ISO tank, ocean freight | Export polymer plants | Bulk | Voyage record | Details |
| Celanese VAM | Celanese VAM HQ 12-20 | Standard VAM | 12-20 | 8-12 weeks | ISO tank, rail relay | Dual-source contracts | Bulk | Blend tolerance | Details |
| Celanese VAM | Celanese VAM HQ 14-17 | Standard VAM | 14-17 | 10-14 weeks | ISO tank, covered discharge | Tropical port delivery | Bulk or drum | Yard dwell limits | Details |
| Celanese VAM | Celanese VAM HQ 15-20 | Standard VAM | 15-20 | 12-20 weeks | ISO tank, drums | Construction chemicals | Bulk or drum | Rotation and re-test | Details |
| Celanese VAM | Celanese VAM HQ 20-30 | Standard VAM | 20-30 | 16-24 weeks | Rail car, barge | Buffer stock and hubs | Bulk | Cover and age link | Details |
| Celanese VAM | Celanese VAM HQ 25-30 | Standard VAM | 25-30 | 20-30 weeks | ISO tank, multi-leg | Long multi-leg transit | Bulk or drum | Kinetics qualification | Details |
| VAM EVA Grade | |||||||||
| Celanese VAM | Celanese VAM EVA Grade HQ 3-5 | VAM EVA Grade | 3-5 | Days | ISO tank, road tanker | Copolymer feed, close radius | Bulk | Fresh feed discipline | Details |
| Celanese VAM | Celanese VAM EVA Grade HQ 7-9 | VAM EVA Grade | 7-9 | 1-3 weeks | ISO tank | Film, foam, moulding | Bulk or drum | VA content control | Details |
| Celanese VAM | Celanese VAM EVA Grade HQ 14-17 | VAM EVA Grade | 14-17 | 4-8 weeks | ISO tank, ocean freight | Hot-melt and film | Bulk | Arrival scheduling | Details |
| Celanese VAM | Celanese VAM EVA Grade HQ 15-20 | VAM EVA Grade | 15-20 | 8-16 weeks | ISO tank, ocean freight | Continuous copolymer trains | Bulk | One voyage cover | Details |
| VAM ECO-B | |||||||||
| Celanese VAM | Celanese VAM HQ 3-5 ECO-B | VAM ECO-B | 3-5 | Days | ISO tank, road tanker | Brands reporting scope 3 | Bulk or drum | Attribution ledger | Details |
| Celanese VAM | Celanese VAM HQ 6-8 ECO-B | VAM ECO-B | 6-8 | 3-5 weeks | ISO tank, rail car | Coating ranges with targets | Bulk or drum | Claim reconciliation | Details |
| Celanese VAM | Celanese VAM HQ 8-10 ECO-B | VAM ECO-B | 8-10 | 5-8 weeks | ISO tank, ocean freight | Audited supply chains | Bulk or drum | Custody documents | Details |
← Swipe horizontally to see all specifications →
Nine plant situations, each with the grade that fits the duty and the reason it wins.
Where a tanker can be discharged straight into the feed line and consumed within days, choose the lowest bands. A narrow window is not a weakness in this setting: it is what keeps the feed fresh, provided the schedule is reliable and the arrival test happens at the gate rather than the following day.
Mid-low bands cover the ordinary case: a delivery every week or two, a tank that is neither empty nor full, and a plant that runs a stable recipe. These grades tolerate a missed schedule without forcing an emergency purchase, which is the realistic test of a regional supply arrangement.
Once a container crosses an ocean, the yard and the vessel become part of the storage period. Mid bands are the practical choice for a voyage of three to five weeks into a temperate port, and they leave enough margin for customs delays without asking the receiving plant to handle a very short window.
Equatorial crossings and open-yard storage at destination both add heat, and heat is what spends the working window. Higher bands are specified for routes where the journey cannot be shortened and the port cannot guarantee covered storage, and the arrival test should happen before the container leaves the quay area.
Where material is bought ahead for a quarterly production plan, the band has to support a storage period rather than a journey. Choose a high band and pair it with a written rotation and re-test rule; without the rule, the extra margin is used up silently and the first sign of trouble is a batch that behaves unexpectedly.
Rail cars, barges and transhipment points add handovers, and every handover adds time that nobody schedules. The highest band exists for cargo that will be in motion or in a yard for months, and it should be paired with sealed openings, recorded seal numbers and an analysis at both loading and discharge.
A second source is only useful if the plant can absorb it without rewriting its storage instruction. Wide bands allow two routes or two suppliers to feed one tank, provided the arrival tolerance is agreed in writing and the first blended batch is run as a qualification batch against the reference curve.
Copolymer plants should select on logistics radius first and band second. A line charging within days belongs on a low band, a sea-fed plant on a mid or high band, and either way the feed specification should include purity and water because copolymer composition responds to more than the inhibitor figure.
Where a customer claim needs supporting, the ECO-B grades carry the same specification and a mass balance attribution behind the lot. Choose the band by the same logistics logic as the conventional grades, then add the document discipline: attribution records filed against lot numbers, and a ledger reconciled before any statement is issued.
Short answers to what buyers ask before the first drum or tanker.
Start at the 10-12 band and check the discharge port. A temperate port with covered storage is usually served by mid bands, while a tropical port with open-yard handling justifies the next step up. Confirm against the actual dwell time rather than the sailing schedule.
It can lengthen the induction period, and the size of the effect depends on the recipe. For most recipes the loading is small relative to the batch, but a change of band is still a change of feed, so run a qualification batch and compare the conversion curve with the reference before committing.
Yes, provided the changeover is documented. Drain the line, pump and filter, record the residual volume against a written limit, and treat the first batch after the switch as a qualification batch. A tank that holds two ages without a record cannot be investigated later.
The three ECO-B grades: HQ 3-5, HQ 6-8 and HQ 8-10. Attribution is by mass balance, so the specification and handling are the same as the conventional grades at the same band, while the claim rests on documents attached to the lot rather than on physical separation.
The specification is the same monomer. The EVA Grade line is organised around copolymer feed, where purity and water sit alongside the inhibitor band and where the running pattern is usually continuous. Select the line by process type, then the band by logistics.
Suppliers report it by gas chromatography and state the method on the batch analysis. Because results depend on sample handling, a receiving laboratory should follow a comparable procedure. Trend matters more than a single figure: one passing value says little, a rising or falling line says a lot.
Tell us the process, the inhibitor band and the delivery form; we send back the two or three grades worth testing.
Scan to WhatsApp