Celanese VAM HQ 15-20
Home Standard VAM Celanese VAM HQ 15-20

Celanese VAM HQ 15-20

Vinyl Acetate Monomer HQ 15-20 · inhibitor 15-20 ppm

Celanese VAM HQ 15-20 product packaging
Standard VAM

Vinyl Acetate Monomer HQ 15-20

Built for buyers whose material sits in a warehouse for a quarter or more before it is charged, typically a regional stock point or a construction chemical plant with a long production calendar. The band is sized so that the answer to how long it has been stored is a matter of record rather than a guess.

HQ 15-20 ppmLong warehouse stayDrum and tank

Request a quotation

Typical properties

Specification Snapshot

Typical values, not for specification. Batch certificate governs delivery.

Chemical nameVinyl Acetate Monomer (VAM)
CAS / EINECS108-05-4 / 203-545-4
Formula / MWC4H6O2 / 86.09
AppearanceClear, colourless liquid, free of suspended matter
VA purity≥ 99.9 wt% (typical)
Water≤ 200 ppm (0.02 wt%, typical)
Acidity as acetic acid≤ 50 ppm (typical)
Acetaldehyde≤ 50 ppm (typical)
Methyl acetate≤ 50 ppm (typical)
Ethyl acetate≤ 250 ppm (typical)
Colour≤ 5 Pt-Co (typical)
Distillation range @760 mmHg72.3 – 73.1 °C
Density @20/20 °C0.9320 – 0.9345 g/cm³
Boiling point72.7 °C
Melting point− 93.2 °C
Flash point (closed cup)− 8 °C
Autoignition temperature385 – 427 °C (source dependent)
Explosive limits in air2.6 – 13.4 vol%
Vapour pressure @20 °C11.7 kPa
Vapour density (air = 1)3.0
Solubility in water @20 °C≈ 2 g/100 mL
Refractive index n20/D1.395
Inhibitor (hydroquinone, HQ)15-20 ppm
Storage stabilityDepends on temperature, oxygen availability and inhibitor consumption; periodic HQ and polymer re-test recommended
Extended warehouse residence

Warehouse Residence

Material that stays put needs a schedule, not a memory. This section covers the re-test interval, the stacking rules and the point at which a lot stops being stock and becomes a decision.

Interval and trigger

Set a re-test interval tied to storage temperature and a second trigger tied to elapsed time. Two triggers catch both the slow drift of a cool store and the faster drift of a warm one, which a single calendar rule cannot do.

Stack and access

Stack drums no higher than the handling plan supports and keep labels, closures and lot numbers readable from the aisle. A stack that must be dismantled to read a lot number is a stack that will be sampled late.

Sun and heat

Keep stored goods away from roof glazing and roller doors that face the afternoon sun. The temperature difference between a shaded aisle and the top of a stack under glass is larger than most store keepers expect.

First in, first out

Rotate stock by lot date and mark each delivery with its arrival week. Physical rotation is the cheapest control available and needs no instrument to work.

Withdrawing a lot

Write the withdrawal rule in advance: what result allows use, what requires investigation and what removes the lot. A rule agreed while the store is calm is followed when it is not.

Handling

Processing Notes

Stainless steel or aluminium only. Confirm the headspace practice against documented supplier guidance instead of assuming a nitrogen blanket is protective.

Store conditions

Keep the store shaded, dry and ventilated, with no ignition sources and no oxidiser storage in the same bay. Segregation is a layout decision, not a label on a drum.

Drum integrity

Inspect closures and bungs on arrival and during each stock check. A weeping bung is a slow leak of both product and inhibitor protection, and it is invisible from the aisle side of a pallet.

Sampling in store

Sample from the drum that will be charged, not from a reference drum kept aside. A retained sample describes the lot as delivered, not the drum in service.

Movement records

Log every move between bays. Movement is the moment a drum is most likely to be damaged, and a move record explains damage that would otherwise look like a supplier fault.

Applications

Where It Fits

Each route below links to the application map for the full grade set.

Redispersible powder and tile adhesive plants

Regional stores serving several small lines

Seasonal binder demand held in stock

Coating kitchens with quarterly buying

Delivery

Packing and Delivery

Every export lot ships with a batch certificate of analysis.

Packed
200 L steel drums
Bulk
ISO tank where tankage exists
Documents
Batch analysis per lot
Cross reference

Related Grades

Compare the inhibitor band, storage window and delivery form side by side.

Knowledge base

Related News

Technical, knowledge and commercial notes written for this product line.

All news

Contact

Request a Quotation

Send your required volume, delivery form and site for Celanese VAM HQ 15-20; we reply with the matching grade, the batch documentation and the shipping window.

WhatsApp QR code for Fred Wang
Fred Wang
Scan to WhatsApp — +8615380400285
sales2@liwei-chem.com